Cladding Calculator — How Much Cladding Do I Need?
Calculate cladding boards, battens, counter-battens, breather membrane and fixings for external wall cladding. UK standard profiles.
Total length of wall to be clad
Height of area to be clad
150mm boards with 25mm overlap = 125mm effective cover
Nominal board face width
Standard lengths: 2.4m, 3.0m, 3.6m, 4.8m
Board-to-board overlap
Adds 10% extra for cutting and waste
10% standard; 15% for walls with many openings
Enter price per board for a cost estimate
How We Calculate This
This calculator determines the number of cladding boards by dividing the wall area by the coverage area of each board (effective cover width x board length), then adds battens, counter-battens, breather membrane and fixings.
The formula
Boards = Wall area / (Effective cover x Board length) x Wastage factor
Effective cover = Board width - Overlap
Default profiles
- Timber shiplap: 150mm boards, 25mm overlap = 125mm effective cover
- Featheredge: 150mm boards, 50mm overlap = 100mm effective cover
- Composite: ~170mm boards with clip system, no overlap
- Fibre cement: 190mm boards, 30mm overlap = 160mm effective cover
Supporting materials
- Battens: Vertical at 600mm centres (treated softwood)
- Counter-battens: Horizontal at 600mm centres for ventilation cavity
- Breather membrane: Wall area + 15% for overlaps
Standards
Cladding installation should comply with BS 8104 (Code of practice for assessing exposure of walls to wind-driven rain) and Approved Document C (moisture resistance). Timber cladding per BS 8417 (preservation of wood).
Frequently Asked Questions
Related Calculators
Concrete Volume Calculator
Calculate concrete volume in m³ for foundations, slabs and paths.
Concrete Mix Calculator
Work out cement, sand and aggregate ratios for different concrete mixes.
Block Calculator
Calculate how many concrete blocks you need per m² of wall.
Brick Calculator
Work out how many bricks you need for walls, piers and features.
Mortar Calculator
Calculate sand and cement quantities for bricklaying and blockwork mortar.
Last updated: February 2026
All calculations are estimates. Verify with your supplier.